Hospitals
We work with: Adaptability
San José, San José
3,800 m² / $13,000,000 with equipment
2013
Client: CCSS
2 levels
Services involved: Construction and equipment


“The site posed significant challenges due to limited access, requiring thorough planning. As there was no room for truck deliveries, all materials had to be manually transported. Additionally, the project had to be executed within an active hospital complex, requiring meticulous coordination at every step.”

– Eng. Javier Muñoz